Site walk
Walk register
Programme comparison
20 Nov update
Evidence snapshotTarget R1
Recovery simulationHow the model uses project data
Baseline and R1 show an illustrative slab sequence working back from each published roof milestone at 11.5 calendar days per level, using the R1 cycle assumption. Individual pour dates, dimensions and shaft positions are schematic. Façade bands use the zone dates where supplied. Other façade panels are shown at the tower-wide finish milestone. R1 fit-out uses the tower completion gate.
The centre view stays fixed: the 20 November report supplies the project total; the latest available floor evidence is from the November 13 register and November 13–18 structural records. Outlined lift shafts show location only. The model does not allocate the project-wide percentage to floors.
Explore individual programme activities and source dates
Construction sequence
Structure Completion ( Roof Slab)
Finish milestone pending- Printed baseline
- Start unspecified – 2027-03-02
- Recovery target
- Start unspecified – 2027-04-28
Model scope and sources
54 floor or area packages for internal finishes and MEP. Colours follow the selected programme’s start and finish dates. Reported actuals are the single 13 November 2026 snapshot. These dates do not represent erection of the structure.
Floor counts and common facilities follow the BOQ, floor tracker and Zone 1–5 GM Review, slide 27. Footprints, relative placement and storey heights are illustrative. Basement portions represent programme work areas. R1 provides 80 workfront target rows from pages 12, 17 and 22. Two Tower 3 rows on page 17 have target finishes earlier than their starts; they are displayed for review and excluded from playback. Project status on 20 November is reported at project level. Activity-level BL2 progress curves are unavailable.